S-8-946/TRINITY PI over UNNAMED CANAL
4 MI W GOOSE CREEK · County 015, South Carolina · Built 1975 · 2 Lanes · 2,200 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
33.018689, -80.094017
This bridge is in worse condition than 83.9% of bridges in County 015. The average bridge in South Carolina is 0 years old; this one is 51 years old.
Nearby Bridges
S-8-596/OXFORD RD over UNNAMED CANAL
Built 1975
L-3163/DISCOVERYDR over STROBERFIELD BRANCH
Built 2003
S-8-62 over ANCRUM SWAMP
Built 2004
S-8-535/ROYLE RD over ANCRUN SWAMP
Built 2003
S-8-62 over I-26
Built 1961
L-2094/CNTNIALBLVD over CANAL
Built 1999
S-8-535/ROYLE RD over I-26
Built 1961
I-26 over GOOSE CREEK
Built 1960
L-8-2381 over UNNAMED STREAM
Built 1989
US 78 over POPPERDAM CREEK
Built 2001
Bridge Details
- Structure #
- 000000000006624
- Year Built
- 1975
- Length
- 18.3 m (60 ft)
- Max Span
- 9.1 m
- Width
- 8.4 m (27.6 ft)
- Lanes
- 2
- Daily Traffic
- 2,200
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $116,000
- Total Project Cost
- $174,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.