S-37-36 over CONEROSS CREEK

3.5 MI SW WALHALLA · County 073, South Carolina · Built 1973 · 2 Lanes · 1,750 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
5
Fair
Substructure
4
Poor

Bridge Details

Structure #
000000000006342
Year Built
1973
Length
36.6 m (120.1 ft)
Max Span
9.1 m
Width
10.3 m (33.8 ft)
Lanes
2
Daily Traffic
1,750
Material
Prestressed Concrete
Design
Channel Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$458,000
Total Project Cost
$687,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.