S-41-21 over HALFWAY SWAMP CREEK
9.8 MI NW SALUDA · County 081, South Carolina · Built 1970 · 2 Lanes · 125 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 4 | Poor |
Location
34.098814, -81.898389
This bridge is in worse condition than 96% of bridges in County 081. The average bridge in South Carolina is 0 years old; this one is 56 years old.
Nearby Bridges
S-24-103 over THOMPSON CREEK
Built 1962
SC 702 over HALFWAY SWAMP CREEK
Built 1998
S-41-227 over BR TO HALFWAY SWAMP
Built 1979
S-41-227 over HALFWAY SWAMP
Built 1979
S-41-98 over HALFWAY SWAMP CREEK
Built 1955
S-41-98 over TRIB TO HALFWAY SWP CK
Built 1973
S-41-79 over SHILOH BRANCH
Built 1968
S-41-65 over BIG CREEK
Built 1955
SC 702 over BIG CREEK
Built 2015
S-41-82 over TRIB TO BIG CREEK
Built 1957
Bridge Details
- Structure #
- 000000000005844
- Year Built
- 1970
- Length
- 36.6 m (120.1 ft)
- Max Span
- 9.1 m
- Width
- 8.4 m (27.6 ft)
- Lanes
- 2
- Daily Traffic
- 125
- Material
- Prestressed Concrete
- Design
- Channel Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $361,000
- Total Project Cost
- $542,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.