S-14-257 over TRIB TO LAKE MARION
7MI SW SUMMERTON · County 027, South Carolina · Built 1970 · 2 Lanes · 175 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
33.569136, -80.417483
This bridge is in worse condition than 67.1% of bridges in County 027. The average bridge in South Carolina is 0 years old; this one is 56 years old.
Nearby Bridges
S-14-76 over BIG BRANCH
Built 1997
S-14-373 over I-95
Built 1968
S-14-41 over BIG BRANCH
Built 1948
S-14-76 over JACKS CREEK
Built 1990
S-14-127 over TRIB OF TAWCAW CREEK
Built 1993
I-95 SB over US 15
Built 1968
I-95 NB over US 15
Built 1968
S-14-26 over JACKS CREEK
Built 1963
S-14-128 over BIG BRANCH
Built 1989
I-95 SB over LAKE MARION RELIEF
Built 1968
Bridge Details
- Structure #
- 000000000005689
- Year Built
- 1970
- Length
- 18.3 m (60 ft)
- Max Span
- 9.1 m
- Width
- 8.4 m (27.6 ft)
- Lanes
- 2
- Daily Traffic
- 175
- Material
- Prestressed Concrete
- Design
- Channel Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.