S-16-23 over BEAVERDAM CREEK

5MI NW HARTSVILLE · County 031, South Carolina · Built 1969 · 2 Lanes · 2,200 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
000000000005500
Year Built
1969
Reconstructed
2003
Length
22.9 m (75.1 ft)
Max Span
4.6 m
Width
8.6 m (28.2 ft)
Lanes
2
Daily Traffic
2,200
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$309,000
Total Project Cost
$464,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.