S-40-1795 over I-20

4MI SW PONTIAC · County 079, South Carolina · Built 1965 · 2 Lanes · 4,200 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 5 Fair
Substructure 6 Satisfactory

Location

34.083828, -80.8823

This bridge is in worse condition than 78.2% of bridges in County 079. The average bridge in South Carolina is 0 years old; this one is 61 years old.

Nearby Bridges

Bridge Details

Structure #
000000000004660
Year Built
1965
Length
71.9 m (235.9 ft)
Max Span
18.3 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
4,200
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$435,000
Total Project Cost
$653,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.