S-36-244 over BUSH RIVER

7.4 MI SE NEWBERRY · County 071, South Carolina · Built 1963 · 2 Lanes · 550 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000000004185
Year Built
1963
Length
73.2 m (240.2 ft)
Max Span
9.1 m
Width
8.4 m (27.6 ft)
Lanes
2
Daily Traffic
550
Material
Prestressed Concrete
Design
Channel Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$842,000
Total Project Cost
$1,263,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.