S-23-333 over GILDER CREEK

2.4 MI E MAULDIN · County 045, South Carolina · Built 1962 · 2 Lanes · 5,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 5 Fair
Substructure 5 Fair

Location

34.773322, -82.267583

This bridge is in worse condition than 76.7% of bridges in County 045. The average bridge in South Carolina is 0 years old; this one is 64 years old.

Nearby Bridges

Bridge Details

Structure #
000000000003889
Year Built
1962
Length
13.7 m (44.9 ft)
Max Span
4.6 m
Width
8.4 m (27.6 ft)
Lanes
2
Daily Traffic
5,000
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$225,000
Total Project Cost
$338,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.