US 1 NB over PEE DEE OVERFLOW (NO. 1)

0.5 MI NE OF CHERAW · County 069, South Carolina · Built 1961 · 2 Lanes · 7,400 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
000000000003693
Year Built
1961
Length
155.4 m (509.8 ft)
Max Span
9.1 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
7,400
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,089,000
Total Project Cost
$1,634,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.