I-185 over S-5 AND SOUTHERN R.R.

2.5MI S OF GREENVILLE · County 045, South Carolina · Built 1959 · 4 Lanes · 14,500 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
000000000002962
Year Built
1959
Length
73.2 m (240.2 ft)
Max Span
12.2 m
Width
20.2 m (66.3 ft)
Lanes
4
Daily Traffic
14,500
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,055,000
Total Project Cost
$1,583,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.