SC 421 over SOU. RAILROAD

1 MI E OF CLEARWATER · County 003, South Carolina · Built 1956 · 4 Lanes · 9,000 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
000000000002286
Year Built
1956
Reconstructed
1972
Length
57.9 m (190 ft)
Max Span
11.6 m
Width
17.4 m (57.1 ft)
Lanes
4
Daily Traffic
9,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$855,000
Total Project Cost
$1,283,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.