SC 3 over NORTH EDISTO RIVER

6MI NW OF NORTH · County 075, South Carolina · Built 1955 · 2 Lanes · 3,400 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 5 Fair
Substructure 6 Satisfactory

Location

33.654192, -81.1837

This bridge is in worse condition than 68.2% of bridges in County 075. The average bridge in South Carolina is 0 years old; this one is 71 years old.

Nearby Bridges

Bridge Details

Structure #
000000000002229
Year Built
1955
Length
97.5 m (319.9 ft)
Max Span
9.8 m
Width
8.8 m (28.9 ft)
Lanes
2
Daily Traffic
3,400
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$584,000
Total Project Cost
$876,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.