S-30-344 over BANKS CREEK
15.5 MI SW CLINTON · County 059, South Carolina · Built 1955 · 2 Lanes · 1,150 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
34.262797, -81.97725
This bridge is in worse condition than 72.8% of bridges in County 059. The average bridge in South Carolina is 0 years old; this one is 71 years old.
Nearby Bridges
S-30-87 over BANKS CREEK
Built 1990
S-30-88 over LOCAL STREAM
Built 1987
S-30-91 over LAKE GREENWOOD BAY
Built 1958
SC 72 EB over CANE CREEK
Built 2006
SC 72 WB over CANE CREEK
Built 2005
SC 560 over NORTH CAMPBELL CREEK
Built 1979
S-30-659 over NORTH CAMPBELL CREEK
Built 1973
S-36-506 over BR TO LAKE GREENWOOD
Built 1967
US 221 over SALUDA RIVER
Built 1989
C-36-304 over TRIB TO LK GREENWOOD
Built 2005
Bridge Details
- Structure #
- 000000000002210
- Year Built
- 1955
- Length
- 25.6 m (84 ft)
- Max Span
- 4.4 m
- Width
- 7.8 m (25.6 ft)
- Lanes
- 2
- Daily Traffic
- 1,150
- Material
- Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $340,000
- Total Project Cost
- $510,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.