S-42-82 over SOUTH TYGER RIVER

7.5 MI SE GREER · County 083, South Carolina · Built 1954 · 2 Lanes · 4,300 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000000002088
Year Built
1954
Length
82.3 m (270 ft)
Max Span
9.1 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
4,300
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$502,000
Total Project Cost
$753,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.