US 17 over EDISTO RIVER

AT JACKSONBORO · County 029, South Carolina · Built 1953 · 6 Lanes · 19,300 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
000000000001941
Year Built
1953
Reconstructed
1973
Length
207.3 m (680.1 ft)
Max Span
24.4 m
Width
23 m (75.5 ft)
Lanes
6
Daily Traffic
19,300
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,706,000
Total Project Cost
$4,059,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.