US 17 SB over NORTH SANTEE RIVER

16MI SW GEORGETOWN · County 043, South Carolina · Built 1951 · 2 Lanes · 5,100 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000001823
Year Built
1951
Length
659.7 m (2164.4 ft)
Max Span
36.6 m
Width
10 m (32.8 ft)
Lanes
2
Daily Traffic
5,100
Material
Steel Continuous
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$7,222,000
Total Project Cost
$10,833,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.