SC 72 over GRASSY RUN BRANCH

CITY OF CHESTER · County 023, South Carolina · Built 1951 · 4 Lanes · 8,700 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
000000000001806
Year Built
1951
Reconstructed
1974
Length
11.2 m (36.7 ft)
Max Span
3.7 m
Width
30.6 m (100.4 ft)
Lanes
4
Daily Traffic
8,700
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.