11.2MI SE ST GEORGE · County 035, South Carolina · Built 1950 · 2 Lanes · 400 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
33.122814, -80.391031
This bridge is in worse condition than 38.7% of bridges in County 035. The average bridge in South Carolina is 0 years old; this one is 76 years old.
Nearby Bridges
US 78 over COLDWATER BRANCH
Built 1928
S-18-56 over FOUR HOLE SWAMP
Built 1967
US 178/E MAIN ST over WALNUT CREEK (NO. 2)
Built 1929
S-18-56 over FOUR HOLE SWAMP
Built 1967
S-18-56 over FOUR HOLE SWAMP
Built 1967
S-18-56 over UNNAMED STREAM
Built 1964
US 78 over FOUR HOLE SWAMP
Built 1948
US 78 over FOUR HOLE SWAMP
Built 2017
S-18-28 over LITTLE WALNUT BRANCH
Built 1973
US 178/E MAIN ST over WALNUT CREEK (NO. 1)
Built 1928
Bridge Details
- Structure #
- 000000000001698
- Year Built
- 1950
- Reconstructed
- 1970
- Length
- 18.3 m (60 ft)
- Max Span
- 3 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 400
- Material
- Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.