SC 41 over MAPLE SWAMP (NO. 2)

2 MI NE OF GRESHAM · County 067, South Carolina · Built 1949 · 2 Lanes · 2,200 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000001633
Year Built
1949
Length
64 m (210 ft)
Max Span
9.1 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
2,200
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$336,000
Total Project Cost
$504,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.