SC 61/AUGUSTA HWY over EDISTO RIVER SWAMP
2MINW COLL/DORCH CO LN · County 029, South Carolina · Built 1949 · 2 Lanes · 3,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
33.032006, -80.399731
This bridge is in worse condition than 81% of bridges in County 029. The average bridge in South Carolina is 0 years old; this one is 77 years old.
Nearby Bridges
SC 61/AUGUSTA HWY over EDISTO RIVER SWAMP
Built 1949
SC 61 over EDISTO RIVER
Built 1996
S-18-19/WIRE RD over FOUR HOLE SWAMP
Built 1999
S-15-35/PEIRCE RD over DEEP CREEK
Built 1954
S-18-136 over CAPTAINS CREEK
Built 1994
S-18-244 over TRIB TO CYPRESS SWAMP
Built 1964
C-18-136 over CAPTAINS CREEK
Built 1993
S-18-56 over FOUR HOLE SWAMP
Built 1967
S-18-298/WRIGHT RD over TRIB TO CYPRESS SWAMP
Built 1961
S-18-56 over FOUR HOLE SWAMP
Built 1967
Bridge Details
- Structure #
- 000000000001616
- Year Built
- 1949
- Length
- 152.4 m (500 ft)
- Max Span
- 12.2 m
- Width
- 9.9 m (32.5 ft)
- Lanes
- 2
- Daily Traffic
- 3,000
- Material
- Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $729,000
- Total Project Cost
- $1,094,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.