SC 170 over SAVANNAH RIVER SWAMP

NR GA/SC LN · County 053, South Carolina · Built 1940 · 2 Lanes · 3,800 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000001065
Year Built
1940
Length
64 m (210 ft)
Max Span
9.1 m
Width
8.4 m (27.6 ft)
Lanes
2
Daily Traffic
3,800
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$372,000
Total Project Cost
$558,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.