US 15 SB over POCOTALIGO RIVER

2 MI S OF SUMTER · County 085, South Carolina · Built 1935 · 2 Lanes · 10,600 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
6
Satisfactory
Superstructure
4
Poor
Substructure
4
Poor

Bridge Details

Structure #
000000000000703
Year Built
1935
Reconstructed
1962
Length
51.3 m (168.3 ft)
Max Span
11.1 m
Width
14.4 m (47.2 ft)
Lanes
2
Daily Traffic
10,600
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$295,000
Total Project Cost
$325,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.