SC 410 over PLEASANT MEADOW SWAMP

6.0MI NE OF LORIS · County 051, South Carolina · Built 1931 · 2 Lanes · 3,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000000553
Year Built
1931
Reconstructed
1975
Length
38.1 m (125 ft)
Max Span
7.6 m
Width
14.4 m (47.2 ft)
Lanes
2
Daily Traffic
3,000
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.