US 78/W 5TH ST N over GREAT CYPRESS SWAMP #3

6.7 MI NW OF SUMMERVILLE · County 035, South Carolina · Built 1919 · 2 Lanes · 7,800 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
000000000000337
Year Built
1919
Reconstructed
1934
Length
20.5 m (67.3 ft)
Max Span
3.7 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
7,800
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.