ESMOND MILL DR over WOONASQUATUCKET RIVER

0.1M WEST OF RI104 · County 007, Rhode Island · Built 2021 · 2 Lanes · 500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
000000000012445
Year Built
2021
Length
14.4 m (47.2 ft)
Max Span
13.2 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
500
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$650,000
Total Project Cost
$1,691,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.