TILLINGHAST RD over FRENCHTOWN BROOK
1 MI SOUTH OF MIDDLE RD · County 003, Rhode Island · Built 1981 · 2 Lanes · 2,105 vehicles/day
Overall
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
41.629683, -71.513475
This bridge is in worse condition than 56.5% of bridges in County 003. The average bridge in Rhode Island is 0 years old; this one is 45 years old.
Nearby Bridges
ADIRONDACK DRIVE over FRENCHTOWN BROOK
Built 1980
RI 403 over RI 4 RAMPS 4I & 4G
Built 2006
RI 402 FRNCHTWN RD over RAMP 4E TO RI 402 RI 4
Built 1973
RI 4 NB & SB over FRENCHTOWN BROOK
Built 1970
RI 402 FRNCHTWN RD over RAMP D FROM RI 4 TO 403
Built 2008
RI 402 RAMP-G over RAMP 4D FROM RI 4 TO 403
Built 2008
DAVISVILLE RD over FRENCHTOWN BROOK
Built 2012
RI 2 SO COUNTY TR over RI 4
Built 1973
RI 403 over FRENCHTOWN ROAD
Built 2008
RI 402 FRNCHTWN RD over HUNT RIVER
Built 1928
Bridge Details
- Structure #
- 000000000011980
- Year Built
- 1981
- Length
- 7.3 m (24 ft)
- Max Span
- 3 m
- Width
- 9 m (29.5 ft)
- Lanes
- 2
- Daily Traffic
- 2,105
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $229,000
- Total Project Cost
- $595,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.