RI 126 SMTHFLD AV over AMTRAK & P&W RR
0.1 MI E OF SILVER SPRING · County 007, Rhode Island · Built 1984 · 4 Lanes · 13,535 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
41.856467, -71.409925
This bridge is in worse condition than 55.2% of bridges in County 007. The average bridge in Rhode Island is 0 years old; this one is 42 years old.
Nearby Bridges
RI 126 SMTHFLD AV over I-95 NB & SB
Built 1965
CEMETERY ST over MOSHASSUCK RIVER
Built 1964
RI 126 SMTHFLD AV over MOSHASSUCK RIVER
Built 1964
RI 126 SMTHFLD AV over CONCORD ST
Built 1964
I-95 N SERVICE RD over MOSHASSUCK RIVER
Built 1964
I-95 NB & SB over MOSHASSUCK RIVER
Built 1963
BRANCH AV over AMTRAK & P&W RR
Built 1984
BRANCH AV over I-95 NB & SB
Built 1965
BRANCH AV over WEST RIVER
Built 2013
HAWKINS ST over WEST RIVER
Built 2020
Bridge Details
- Structure #
- 000000000009320
- Year Built
- 1984
- Length
- 202.9 m (665.7 ft)
- Max Span
- 45.7 m
- Width
- 22.3 m (73.2 ft)
- Lanes
- 4
- Daily Traffic
- 13,535
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,526,000
- Total Project Cost
- $6,567,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.