RI 138 over GILBERT STUART RD

0.5 MI W OF JCT RI 138 · County 009, Rhode Island · Built 1969 · 4 Lanes · 36,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000000008980
Year Built
1969
Reconstructed
1990
Length
23.5 m (77.1 ft)
Max Span
19.5 m
Width
26.7 m (87.6 ft)
Lanes
4
Daily Traffic
36,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$344,189,000
Total Project Cost
$894,891,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.