CAPRON RD over WOONASQUATUCKET RIVER

1.0 MI E OF JCT RI 104 · County 007, Rhode Island · Built 2017 · 2 Lanes · 1,396 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000000007925
Year Built
2017
Length
9.8 m (32.2 ft)
Max Span
8.5 m
Width
11.4 m (37.4 ft)
Lanes
2
Daily Traffic
1,396
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$439,000
Total Project Cost
$1,142,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.