AIRPORT CONNECTOR over AMTRAK
0.6 MI W OF JCT US 1 · County 003, Rhode Island · Built 1967 · 6 Lanes · 42,100 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
41.723269, -71.443592
This bridge is in worse condition than 56.5% of bridges in County 003. The average bridge in Rhode Island is 0 years old; this one is 59 years old.
Nearby Bridges
AIRPORT CONNECTOR over JEFFERSON BLVD
Built 1967
AIRPORT CONNECTOR over US 1 POST RD
Built 1968
AIRPORT ELEV RDWY over PLAZA TERMINALS PARKING
Built 1996
CORONADO RD over AMTRAK
Built 1980
AIRPORT ELEV RDWY over ARRIVAL ROAD
Built 1996
AIRPORT ELEV RDWY over PLAZA TERMINALS PARKING
Built 1996
METRO CENTER DRIVE over AIRPORT CONNECTOR
Built 1967
RI 113 MAIN AV over US 1 POST RD
Built 1976
RI 113 MAIN AV over AMTRAK
Built 2006
AIRPORT CONNECTOR over I-95 NB & SB
Built 1966
Bridge Details
- Structure #
- 000000000007720
- Year Built
- 1967
- Length
- 27.1 m (88.9 ft)
- Max Span
- 25.6 m
- Width
- 32.9 m (107.9 ft)
- Lanes
- 6
- Daily Traffic
- 42,100
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,723,000
- Total Project Cost
- $7,081,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.