I-95 RAMP BR-2 over MOSHASSUCK RIVER

I-95 NB @ EXIT 24 · County 007, Rhode Island · Built 1965 · 1 Lanes · 8,600 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000007100
Year Built
1965
Reconstructed
2007
Length
40.7 m (133.5 ft)
Max Span
17.1 m
Width
8.7 m (28.5 ft)
Lanes
1
Daily Traffic
8,600
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,157,000
Total Project Cost
$5,608,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.