GOAT ISL CAUSEWAY over NEWPORT HARBOR

0.3 MI W OF JCT RI 138A · County 005, Rhode Island · Built 1965 · 2 Lanes · 3,704 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
000000000006970
Year Built
1965
Length
325.3 m (1067.3 ft)
Max Span
13.2 m
Width
11.7 m (38.4 ft)
Lanes
2
Daily Traffic
3,704
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$23,285,000
Total Project Cost
$60,541,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.