I-95 NB & SB over AMTRAK
1.5 MI S OF JCT US 1A · County 007, Rhode Island · Built 1964 · 9 Lanes · 129,532 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
41.78645, -71.421586
This bridge is in worse condition than 86.3% of bridges in County 007. The average bridge in Rhode Island is 0 years old; this one is 62 years old.
Nearby Bridges
I-95 NB & SB over NARR ELEC CO SIDING
Built 1964
US 1 ELMWOOD AV over HAR JUNC BR LINE P&W RR
Built 2018
I-95 NB over US 1 ELMWOOD AV
Built 2024
I-95 SB over WELLINGTON AV
Built 2023
I-95 SB over US 1 ELMWOOD AV
Built 2024
I-95 NB over WELLINGTON AV
Built 2023
ROGER WILLIAMS AV over AMTRAK & P&W RR
Built 2001
RI 10 RAMP BC over I-95 NB & SB
Built 1965
I-95 RAMP B-EL over WELLINGTON AV & AMTRAK
Built 1965
RI 10 HUNTNGTN EXP over I-95 NB & SB AMTRAK
Built 1965
Bridge Details
- Structure #
- 000000000006600
- Year Built
- 1964
- Reconstructed
- 1992
- Length
- 92.7 m (304.1 ft)
- Max Span
- 34.1 m
- Width
- 43.7 m (143.4 ft)
- Lanes
- 9
- Daily Traffic
- 129,532
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $24,708,000
- Total Project Cost
- $64,242,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.