I-95 SB over TEFFT HILL TRAIL

2.1 MI S OF JCT RI 102 · County 009, Rhode Island · Built 2017 · 2 Lanes · 26,973 vehicles/day

Overall
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000005927
Year Built
2017
Length
6.1 m (20 ft)
Max Span
6.1 m
Width
29.3 m (96.1 ft)
Lanes
2
Daily Traffic
26,973
Material
Concrete
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,088,000
Total Project Cost
$2,829,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.