I-95 NB over US 6 WOON RVR AMTRAK
0.25 MI N ATWELLS AV · County 007, Rhode Island · Built 2022 · 5 Lanes · 95,468 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
41.826325, -71.418919
This bridge is in worse condition than 4.4% of bridges in County 007. The average bridge in Rhode Island is 0 years old; this one is 4 years old.
Nearby Bridges
I-95 SB over US 6 WOON RVR AMTRAK
Built 2016
RAMP CB-2 over AMTRAK & CITY STREETS
Built 2023
RAMP AD over AMTRAK WOON RVR RAMP BD
Built 1988
RAMP DB-1 over AMTRAK CITY STS WOON RVR
Built 2024
RAMP A-C over US 6 EXTENSION RAMP C-C
Built 1988
I-95 RAMP DA over US 6 W EXCH RMPSCB AC CC
Built 1988
I-95 RAMP CA over RAMP CC & W. EXCHANGE ST
Built 1988
RAMP BC over WEST EXCHANGE ST
Built 1988
I-95 RAMP BD over US 6 W EXCHANGE ST RAMPS
Built 1988
PARK ST over WOONASQUATUCKET RIVER
Built 1983
Bridge Details
- Structure #
- 000000000005785
- Year Built
- 2022
- Length
- 393.2 m (1290 ft)
- Max Span
- 64 m
- Width
- 27.8 m (91.2 ft)
- Lanes
- 5
- Daily Traffic
- 95,468
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $42,790,000
- Total Project Cost
- $111,253,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.