WOODVILLE-ALTON RD over I-95 NB & SB

0.5 MI S OF RI 3 · County 009, Rhode Island · Built 1969 · 2 Lanes · 3,600 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000000005670
Year Built
1969
Length
43.3 m (142.1 ft)
Max Span
23.5 m
Width
20.6 m (67.6 ft)
Lanes
2
Daily Traffic
3,600
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,441,000
Total Project Cost
$14,147,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.