US 6 OLNEYVLLE EXP over WESTMINSTER AMTRAK

RI-10 SB TO US-6 WB RAMP · County 007, Rhode Island · Built 2020 · 2 Lanes · 40,760 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000000005046
Year Built
2020
Length
58.8 m (192.9 ft)
Max Span
31.8 m
Width
10.8 m (35.4 ft)
Lanes
2
Daily Traffic
40,760
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,880,000
Total Project Cost
$10,087,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.