RI 146 N SMFLD EXP over POUND HILL RD

2.0 MI N OF JCT RI 104 · County 007, Rhode Island · Built 1958 · 4 Lanes · 5,348 vehicles/day

Overall
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000004430
Year Built
1958
Reconstructed
2019
Length
19.2 m (63 ft)
Max Span
16.8 m
Width
32.3 m (106 ft)
Lanes
4
Daily Traffic
5,348
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,778,000
Total Project Cost
$9,822,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.