LAUREL AV over PAWTUXET RIVER
0.1 MI S OF JCT RI 117 · County 003, Rhode Island · Built 1900 · 2 Lanes · 5,919 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
41.695542, -71.546953
This bridge is in worse condition than 14.8% of bridges in County 003. The average bridge in Rhode Island is 0 years old; this one is 126 years old.
Nearby Bridges
RI 117 CNTRVLLE RD over WASH SEC BIKE PATH
Built 1959
RI 33 SDY BTTM RD over PAWTUXET RIVER
Built 2021
SOUTH MAIN ST over PAWTUXET RIVER SW BRANCH
Built 1919
PULASKI ST over PAWTUXET RIVER
Built 1965
RI 117 MAIN STREET over PAWTUXET RIVER
Built 1926
FACTORY ST over PAWTUXET RIVER S BRANCH
Built 1956
FACTORY ST over MILL TAIL RACE
Built 1956
RI 115 MAIN ST over PAWTUXET RIVER
Built 1967
MAIN ST over WASH SEC BIKE PATH
Built 2000
FAIRVIEW AV over PAWTUXET RIVER
Built 1956
Bridge Details
- Structure #
- 000000000003970
- Year Built
- 1900
- Reconstructed
- 2012
- Length
- 28 m (91.9 ft)
- Max Span
- 26.2 m
- Width
- 12.8 m (42 ft)
- Lanes
- 2
- Daily Traffic
- 5,919
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,190,000
- Total Project Cost
- $5,693,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.