GAZZA RD over CHEPACHET RIVER
0.5 MI S OF JCT MAIN ST · County 007, Rhode Island · Built 1965 · 2 Lanes · 305 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
41.942192, -71.647553
This bridge is in worse condition than 55.2% of bridges in County 007. The average bridge in Rhode Island is 0 years old; this one is 61 years old.
Nearby Bridges
RI 107 MAIN ST over CHEPACHET RIVER
Built 1903
VICTORY HWY over PASCOAG RIVER
Built 1918
RI 102 BRONCO HWY over PASCOAG RIVER
Built 1965
RI 102 BRONCO HWY over WHIPPLE AV
Built 2024
RI 107 EAST AV over PASCOAG RIVER
Built 1902
US 44 PUTNAM PIKE over CHEPACHET RIVER
Built 1920
RI 102 BRONCO HWY over BRANCH RVR & JOSLIN RD
Built 1967
VICTORY HWY over BRANCH RIVER
Built 1987
RI 98 SHRMN FRM RD over NIPMUC RIVER
Built 2016
RI 107 CHAPEL ST over PASCOAG RIVER
Built 1947
Bridge Details
- Structure #
- 000000000003530
- Year Built
- 1965
- Reconstructed
- 2008
- Length
- 11.9 m (39 ft)
- Max Span
- 11.1 m
- Width
- 9.1 m (29.9 ft)
- Lanes
- 2
- Daily Traffic
- 305
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $662,000
- Total Project Cost
- $1,721,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.