RI 114 over MT HP BY N SEC RR 114 LP

0.8 MI S OF JCT RI 138 · County 001, Rhode Island · Built 1929 · 2 Lanes · 18,924 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
000000000003000
Year Built
1929
Reconstructed
1985
Length
1480.7 m (4857.9 ft)
Max Span
365.8 m
Width
9.7 m (31.8 ft)
Lanes
2
Daily Traffic
18,924
Material
Steel
Design
Suspension
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$87,541,000
Total Project Cost
$227,607,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.