RI 3 NSNCK HILL RD over NOOSENECK RIVER

2.3 MI S OF JCT I-95 · County 003, Rhode Island · Built 1924 · 4 Lanes · 4,944 vehicles/day

Overall
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000000000360
Year Built
1924
Reconstructed
1939
Length
6.4 m (21 ft)
Max Span
6.4 m
Width
24.3 m (79.7 ft)
Lanes
4
Daily Traffic
4,944
Material
Concrete
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$950,000
Total Project Cost
$2,470,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.