Off PR-3 @ Km152.7 over Unnamed Creek

URB EL COQUÍ-SALINAS · County 123, Puerto Rico · Built 2006 · 2 Lanes · 10,400 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
030131
Year Built
2006
Length
7.4 m (24.3 ft)
Max Span
2.1 m
Width
30.8 m (101 ft)
Lanes
2
Daily Traffic
10,400
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$446,000
Total Project Cost
$559,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.