PR 10 38.7 KM over PR123 50.1 KM & RIO
3.66 KMS. SW. OF UTUADO · County 141, Puerto Rico · Built 2012 · 3 Lanes · 7,600 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
18.238092, -66.720494
This bridge is in worse condition than 5.1% of bridges in County 141. The average bridge in Puerto Rico is 0 years old; this one is 14 years old.
Nearby Bridges
PR 10 39.1 KM over DIRT ROAD
Built 2009
PR 123 48.2 KM over PELLEJAS RIVER
Built 1924
PR 10 39.6 KM over UNNAMED CREEK
Built 2012
OFF PR 123 48.1 KM over ADJUNTAS RIVER
Built 1975
PR-10 over OFF PR-123 AT KM. 52.0
Built 2012
OFF PR 123 @ KM 52 over GRANDE DE ARECIBO RIVER
Built 1976
OFF PR 123 AT 46.2 over GRANDE DE ARECIBO RIVER
Built 1967
PR 10 over PR 603 & WATERWAY
Built 2012
PR 603 1.6 KM over GUANICO RIVER
Built 1954
OFF PR 603 1.2 KM over GUAONICA RIVER
Built 1972
Bridge Details
- Structure #
- 029261
- Year Built
- 2012
- Length
- 450 m (1476.4 ft)
- Max Span
- 45.2 m
- Width
- 17.8 m (58.4 ft)
- Lanes
- 3
- Daily Traffic
- 7,600
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.