RAMP F.PR22 TO PR2 over CONNECTOR

11.84 KMS. N. OF GUAYNABO · County 061, Puerto Rico · Built 2002 · 1 Lanes · 20,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
026961
Year Built
2002
Length
50 m (164 ft)
Max Span
38.7 m
Width
8.1 m (26.6 ft)
Lanes
1
Daily Traffic
20,000
Material
Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.