LA HACDA ST 0.1 KM over PI%ONAS RIVER
0.4 KM AT W.BARRANQUITAS · County 019, Puerto Rico · Built 1998 · 2 Lanes · 100 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
18.186725, -66.317183
This bridge is in worse condition than 33.3% of bridges in County 019. The average bridge in Puerto Rico is 0 years old; this one is 28 years old.
Nearby Bridges
PR 156 over BARRANQUITAS RIVER
Built 1911
0FF PR-156 AT13.50 over TRES CRUCES RIVER
Built 2011
LOCAL ROAD over PI%ONA RIVER
Built 1986
PR 152R over PI%ONA RIVER
Built 1998
PR 152R 1.4 KM over PADILLA CREEK
Built 1981
PR 156 over BARRANQUITAS RIVER
Built 1908
PR 558 0.2 KM over USABON RIVER
Built 1968
PR 162 14.1 KM over USABON RIVER
Built 1908
PR 162 over USABON RIVER
Built 1908
LOCAL ROAD over Barrancas Creek
Built 2010
Bridge Details
- Structure #
- 025631
- Year Built
- 1998
- Length
- 29 m (95.1 ft)
- Max Span
- 27.8 m
- Width
- 7.5 m (24.6 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.