OFF PR 765 2.7 KM over BLANCA CREEK
5 KM AT SW OF SAN LORENZO · County 129, Puerto Rico · Built 1996 · 1 Lanes · 7,700 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 4 | Poor |
Location
18.154119, -66.014058
This bridge is in worse condition than 80.4% of bridges in County 129. The average bridge in Puerto Rico is 0 years old; this one is 30 years old.
Nearby Bridges
OFF PR 913 over HONDA CREEK
Built 1999
Cam. Carrasco Km. over Waterway
Built 2002
OFF PR 765 1.6 KM over BLANCA CREEK
Built 2000
LOCAL ROAD over GRANDE DE PATILLAS RIVER
Built 2012
PR 765 over TURABO RIVER
Built 1973
PR 765 6.1 KM over ANON CREEK
Built 1950
PR 913 over HONDA CREEK
Built 1986
OFF PR 745 3.2 KM over EMAJAGUA RIVER
Built 1950
OFF PR 788 4.2 KM over UNKNOWN CREEK
Built 1999
OFF PR 913 over Waterway
Built 2007
Bridge Details
- Structure #
- 025531
- Year Built
- 1996
- Length
- 9.6 m (31.5 ft)
- Max Span
- 3.7 m
- Width
- 5.2 m (17.1 ft)
- Lanes
- 1
- Daily Traffic
- 7,700
- Material
- Concrete
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $97,000
- Total Project Cost
- $122,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.