PR 53 11.5 KM over PR 974 AND DAGUAO RIVER

4.5 KM SOUTH OF CEIBA. · County 037, Puerto Rico · Built 1996 · 4 Lanes · 27,200 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
024551
Year Built
1996
Length
209.5 m (687.3 ft)
Max Span
37.1 m
Width
33.8 m (110.9 ft)
Lanes
4
Daily Traffic
27,200
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.