PR 53 over LOCAL ROAD

3KMS NORTHEAST OF NAGUABO · County 103, Puerto Rico · Built 1996 · 4 Lanes · 15,700 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
024491
Year Built
1996
Length
38.7 m (127 ft)
Max Span
36.6 m
Width
33.9 m (111.2 ft)
Lanes
4
Daily Traffic
15,700
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.