PR 22 WESTBOUND over MANATI RIVER PR 204 &amp

SOUTH OF BARCELONETA TOWN · County 017, Puerto Rico · Built 1994 · 2 Lanes · 47,900 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
022842
Year Built
1994
Length
2362.1 m (7749.7 ft)
Max Span
39.9 m
Width
14.9 m (48.9 ft)
Lanes
2
Daily Traffic
47,900
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$1,056,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.